Owner: Metropolitan Football Stadium District
General Contractor: Turner, Empire, Alvarado
Planner/Designer: Millennium Sports Technologies
ValleyCrest Landscape Development constructed the playing field and all of the irrigation and landscaping outside of the stadium. The construction schedule resulted in the installation of the field during the winter months. The construction and installation sequence was as follows: |
 |
Sub-drain system |
 |
Field aeration system |
 |
Field fertilizer injection system |
 |
Irrigation system |
 |
Root zone mix and a special sod blend |
|
|
|
 |
|